top of page

10/20/26 - 12768 Brewster Drive

7 days ago
1 min read
It has taken about a week to put all of the steel in the Grade Beams and have inspections so we can pour the concrete soon. Click to see more pictures
It has taken about a week to put all of the steel in the Grade Beams and have inspections so we can pour the concrete soon. Click to see more pictures

 
 
 

Comments


Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Search By Tags
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page