434 Tradewinds Avenue, Naples FLThe long awaited construction began with pile driving on July 31st, 2014. A Geotechnical Engineer was on site during this operation to monitor vibration levels to ensure no damage occurs to adjacent properties.
The long awaited construction began with pile driving on July 31st, 2014. A Geotechnical Engineer was on site during this operation to monitor vibration levels to ensure no damage occurs to adjacent properties.