top of page

434 Tradewinds Avenue, Naples FL

The long awaited construction began with pile driving on July 31st, 2014. A Geotechnical Engineer was on site during this operation to monitor vibration levels to ensure no damage occurs to adjacent properties.

Tags:

 
Featured Posts
Recent Posts
Search By Tags
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page