top of page

Framing Update

  • Writer: matsumotodesigns
    matsumotodesigns
  • Oct 30, 2014
  • 1 min read
DSC_0235 (2).JPG
DSC_0234 (2).JPG

The pool is ready to be backfilled and the framers are just about finished wth the 1st living level exterior walls.

 
 
 

Comentarios


Featured Posts
Recent Posts
Search By Tags
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
  • facebook
  • Twitter Round
  • googleplus
  • flickr
bottom of page