10/20/26 - 12768 Brewster Drive
It has taken about a week to put all of the steel in the Grade Beams and have inspections so we can pour the concrete soon. Click to see more pictures


10/16/26 - 12768 Brewster Drive
Forming up the Grade Beams that will tie all the pilings together when poured. Click on the picture to watch a video


09/25/26 - 12768 Brewster Drive
This home is in a Coastal Flood zone and required 105 pilings. This process started on 09/25/26 and took about a week. Click here to see a quick video!


12768 Brewster Drive,Fort Myers,FL
Follow along as we build this beautiful home. Construction started in September, 2026.